Topics

2G and 3G switch-off

Checked 1 November 2026.
Dates are set by each operator and can change. Check with us before you plan around them.

Quick answer

Operators worldwide are closing 2G and 3G to reuse the spectrum for 4G and 5G, usually 3G first. The US, Australia and Singapore have closed 3G, most of Europe has too, and most European 2G networks close between 2027 and 2030. Each operator sets its own date, so devices should be planned around the earliest closure on the networks they use.

Mobile operators around the world are closing their 2G and 3G networks. They reuse the radio spectrum for 4G and 5G, which carry far more data, and stop paying to run equipment few people still use. For anyone with devices in the field, the question is when each network closes, and in which countries.

3G goes first, 2G often lasts longer

In most countries 3G closes first. It carries little traffic, and its spectrum is valuable for 4G and 5G. 2G often stays longer, because its coverage is wide and many alarms, meters, vehicles and other connected devices still use it.

The pattern varies by region.

  • Already closed: the United States, Australia, Singapore and Taiwan have closed most or all of their older networks.
  • Mostly closed: in Europe, 3G is mostly gone, and most 2G networks close between 2027 and 2030. The UK’s operators have committed to close both by 2033 at the latest.
  • Still running: in Latin America, Africa and parts of Asia, both are often still running, with few dates announced.

Each operator sets its own date

There’s rarely one date for a country. Each operator chooses its own timing, usually within rules from its regulator, such as a notice period or keeping emergency calls working. Two networks in the same country can close years apart.

This matters for devices that roam or use more than one network. A device keeps working only as long as a network it can use is still open where it is.

What to do about your devices

  • Find out which devices use 2G or 3G, including those that only fall back to it when 4G is weak or for voice calls.
  • Map them to countries and networks, and plan from the earliest closing date that affects them, not the latest.
  • Choose a long-life replacement. New devices should use LTE-M, NB-IoT, LTE Cat-1 or 5G, chosen for how much data they send and how long their batteries must last.
  • Allow time. Replacing devices in the field takes months, with site visits, testing and stock to arrange.

The Advanced tab lists dates country by country, with a link to each operator’s or regulator’s own notice.

Country3G2G
Austria Off, 2024 to 2025 Planned at some operators, 2028
Belgium Off, 2025 Planned, 2028 to 2029
Bulgaria Closing, last planned 2027 No dates announced
Croatia Partly off No dates announced
Czech Republic Off, 2021 Planned at some operators, 2030
Denmark Off, 2022 to 2025 Planned at some operators, 2030
Estonia Off, 2023 to 2025 Planned at some operators, 2028 to 2030
Finland Off, 2023 to 2024 No dates announced
France Planned at some operators, 2028 to 2029 Closing, last planned 2026
Germany Off, 2021 Planned, 2028
Greece Partly off No dates announced
Hungary Off, 2022 to 2023 No dates announced
Ireland Partly off No dates announced
Italy Closing Planned at some operators, 2029
Latvia Off, 2025 to 2026 No dates announced
Lithuania Off, 2022 to 2025 No dates announced
Luxembourg Partly off Planned at some operators, 2030
Netherlands Partly off Closing
Norway Off, 2021 Partly off, rest planned 2027
Poland Closing Planned at some operators, 2028 to 2030
Portugal Closing Planned at some operators, 2030
Romania Closing Planned at some operators, 2030
Slovakia Off, 2023 to 2025 Planned at some operators, 2028 to 2029
Slovenia Partly off No dates announced
Spain Closing, last planned 2027 Planned at some operators, 2030
Sweden Off, 2025 Partly off, rest planned 2027
Switzerland Partly off Off, 2019 to 2023
United Kingdom Off, 2024 to 2025 Planned, 2029 to 2030
  • No EU-level switch-off deadline exists. BEREC says it is up to mobile operators when and how they phase out technologies, but urges operators switching off both 2G and 3G to keep emergency calls working, even if that means supporting 2G or 3G longer than planned, and to publish which devices will stop working. BEREC
  • BEREC's 2023 report on phase-out practices and challenges covers impacts on emergency calls, eCall, smart meters, M2M and roaming, and notes that licences are technology neutral. BEREC
  • A study commissioned by the European Commission (28 May 2026) estimates 64 million vehicles could lose 2G/3G-based eCall through uncoordinated shutdowns, and recommends the Commission issue guidance urging Member States to keep at least one circuit-switched network until at least 2030. This is the study's recommendation, not adopted policy. European Commission (DG CONNECT)
  • Commission Delegated Regulation (EU) 2024/1180 moves eCall to 4G/5G (IMS packet-switched): required for new vehicle types from 1 January 2026 and for all new vehicles from 1 January 2027. It notes operators plan to phase out 2G/3G between 2025 and 2030. European Commission, via Council of the EU register
Country3G2G
Argentina Closing No dates announced
Brazil No dates announced No dates announced
Canada Closing, last planned 2027 Planned at some operators, 2027
Chile Not confirmed Closing
Colombia Not confirmed Partly off
Mexico No dates announced Partly off
Peru Not confirmed No dates announced
United States Off, 2022 to 2023 Off, last reported 3 August 2026
Country3G2G
Australia Off, 2024 Off, 2016 to 2018
Bangladesh No dates announced Regulator plans to end 2G by December 2029
China Closing Reported closing
Hong Kong Partly off Off, 2021 to 2026
India Closing No dates announced
Indonesia Off at 2 of 3 operators, 2022 to 2023 No dates announced
Japan Off, 2022 to 2026 Off, 2010 to 2012
Malaysia Off, 2021 to 2023 No dates announced
New Zealand Off, 2026 Off, 2012 to 2026
Philippines Closing No dates announced
Singapore Off, 2024 Off, 2017
South Korea No dates announced Off, 2012 to 2021
Taiwan Off, 2024 Off, 2017
Thailand No dates announced No dates announced
Vietnam Closing, last by September 2028 Off, 16 September 2026 (VinaPhone 15 September)
Country3G2G
Bahrain Off at 1 of 3 operators Off at 1 of 3 operators, 2021
Egypt No dates announced No dates announced
Ghana No dates announced No dates announced
Israel No dates announced Partly off, 2026
Kenya No dates announced No dates announced
Kuwait Partly off Planned at some operators, 2027
Nigeria No dates announced No dates announced
Oman Off, 2025 Not confirmed
Qatar Due off 2025, completion not confirmed Not confirmed
Saudi Arabia Off at 1 of 3 operators, 2025 Closing at 1 of 3 operators
South Africa Planned at some operators, 2026 Reported at 1 of 3 operators, 2029
Tanzania No dates announced No dates announced
Turkey No dates announced No dates announced
United Arab Emirates Closing at some operators Closing at some operators

Reported means reputable press says so, but there’s no operator or regulator notice yet. Not confirmed means we found no primary source.

Checked 1 November 2026. Open a country for each operator's dates and sources.

How to read this page

Each operator decides when to close its own 2G and 3G networks, usually within rules set by its regulator or government. The table above gives one line per country. Open a country to see each operator’s dates, the regulator’s rules and a link to every source: the operator’s own page, the regulator or the government. Where we could not find a primary source, we left the operator out rather than guess, so a missing operator means unconfirmed, not still running.

The terms in the tables mean the following. A country line sums up its operators.

  • Off means the operator or regulator has confirmed the network is closed.
  • Closing means the switch-off has started and is not yet finished.
  • Planned means the operator has announced a date. Where that date has passed and the operator has not confirmed the closure, the table says so.
  • No date announced means the network is running and the operator has published no end date.
  • Never had means the operator never ran that technology.
  • Not confirmed means we found no primary source for that network, so we give no date.
  • Partly off means some operators have closed the network and others have not, or have no date.
  • Off at 1 of 3 operators means we confirmed the closure at that many operators and found no source for the others.

Checked 2 October 2026. Dates move, so check the operator’s own notice before you plan a change for a fleet of devices.

The global pattern

3G is going first almost everywhere. It carries little traffic today, and its spectrum is worth more for 4G and 5G. 2G often stays longer, because it has wide coverage and because many alarms, meters, vehicles and other IoT devices still depend on it. The United States, Australia, Singapore, Taiwan have closed most or all of their legacy networks. Across Europe 3G is largely gone, and most 2G networks have dates between 2027 and 2030. In Latin America, Africa and parts of Asia, both are still running, with few dates set.

Regulators increasingly set the terms rather than the dates. Typical rules require notice periods, protect access to emergency calls, or require one 2G network to stay up for a time for alarms and vehicles.

What this means for IoT devices

  • 3G-only devices have already stopped working in much of the world. Where 3G closes before 2G, a device with 2G fallback carries on, on 2G only, until 2G closes too.
  • 2G-only devices stop when the last 2G network they can use closes. A SIM that can use several networks may keep working for a while on a network that keeps 2G longer. When roaming, the visited network’s dates apply, not the home country’s.
  • 4G devices that fall back to 2G or 3G for voice calls (circuit-switched fallback, 3GPP TS 23.272) lose voice when those networks close, unless they support voice over LTE (VoLTE). This matters for alarms and lifts that call a monitoring centre.
  • Emergency calls and eCall are where regulators act most. Several countries now require phones that cannot call emergency services over 4G to be blocked. In the EU, new vehicles move to 4G and 5G eCall from 2026 and 2027.
  • Replacing devices takes time. Plan from the earliest date among the countries and networks your devices use, not the latest. Allow for site visits, certification and stock.

For new devices, choose LTE-M, NB-IoT, LTE Cat-1, Cat-1 bis or 5G RedCap depending on data, power and coverage needs. Check that the technology is available, and can roam, in each country you deploy to.

Myths

2G and 3G are switching off everywhere at the same time.

Each operator sets its own date. 3G has gone in the US, Australia and most of Europe, while 2G and 3G both still run in much of Latin America and Africa. Networks in the same country can close years apart.

2G and 3G close together.

In most countries 3G goes first and 2G stays years longer, because many alarms, meters and vehicles depend on it. A few operators, such as Odido in the Netherlands, closed 2G first.

A 4G device isn’t affected.

Some 4G devices fall back to 2G or 3G where 4G is weak, or for voice calls when they don’t support VoLTE. Both lose that path when the older network closes.

A roaming device can use the visited country’s 2G until the national date.

Roaming access depends on each network’s agreements, and some operators close 2G or 3G to roaming partners before their own customers.

What this means for your devices

Each SIM profile has its own page, showing where it works and what it supports.

Sources

  1. BEREC statement on the 2G and 3G phase-out, BEREC, BoR (26) 85, June 2026
  2. BEREC report on 2G and 3G phase-out practices and challenges, BEREC, BoR (23) 204
  3. EU study informs of eCall service gaps as 2G/3G networks shut down, European Commission, 28 May 2026
  4. Joint statement on the sunsetting of 2G and 3G networks, GOV.UK (DCMS), 8 December 2021
  5. 2G Switch-off Charter, GOV.UK (DSIT), updated 15 September 2026
  6. 2G-Abschaltung, Bundesnetzagentur
  7. Plan ahead for phase out of 3G cellular networks and service, Federal Communications Commission
  8. New telco rules to support continued access to Triple Zero, ACMA, October 2024
  9. Mobile network operators initiate plan to retire 3G services, IMDA, 2023
  10. CRA announces cessation of 3G mobile services by December 2025, Communications Regulatory Authority, Qatar
  11. Circuit Switched (CS) fallback in Evolved Packet System (EPS), 3GPP, TS 23.272
Next Choose a radio technology